Спасибо!

Мы исправим ошибку в ближайшее время

Сообщить об ошибке

Site Tools


Work Distribution by Time Period

  1. Select a VH
  2. Select a period of time for report generation
  3. Press the button “Add report” and select “Diagram: Operation for the Period”

The «Work Distribution by Time Period» report

The following color designations are used in the report:

  • Green color - movement of the VH
  • Yellow color - operation of the VH at idle RPM